The System Details tab shows different information depending on whether you are viewing the actual system itself, or whether you are viewing a level belonging to the system.
If you are viewing the system itself, the Details tab shows the following information about the system:
System Name - This is the name of the system. The system name is set up in the System Definitions table, and cannot be changed from the Details tab.
Total Costs YTD - This is the total costs for this system for the year to date. The cost is calculated by totalling the year to date costs for all the levels for the system.
Total Costs Overall Total - This is the total costs for this system overall. The cost is calculated by totalling the overall costs for all the levels for the system.
If you are viewing a level of the system, the Details tab shows the following information about the system level:
Code - This is a short code for the system level object.
Name - This is the full name for the system level object.
Full Code - This is the full code for the system level object. The full code is made up of the codes for all the parent level objects of the system level object. The full code is determined by the position of the system level object in the system hierarchy, and cannot be edited.
Parent - This is the code for the system level object that is directly above this system level object in the system hierarchy. The parent cannot be edited from the Details tab.
Specific Costs YTD - This is the cost for this system level object for the year to date.
Specific Costs Total - This is the total cost for this system level object for all dates.
Total Costs YTD - This is the total cost for this system level object including all system levels below this one for the year to date. The cost is calculated by totalling the year to date costs for all the levels for the system at or below the current level.
Total Costs Overall Total - This is the total costs for this system level object including all system levels below this one for all years. The cost is calculated by totalling the overall costs for all the levels for the system at or below the current level.