Workshops Report

The Workshops Report provides a list of all the workshops defined in the system.

To run the Workshops Report:

  1. Run the Schedule Module.

  2. Choose Tables>Workshops from the Reports menu option.

  3. Select the parameters for the report (if any). Click the OK button on the report parameter window to run the report.